ArcelorMittal Chatham reinforcement solutions

News

  • Accuracy

    From our premises on Chatham Docks and supported by by our in-house engineering, detailing and drawing service.
  • Detail

    From our premises on Chatham Docks and supported by by our in-house engineering, detailing and drawing service.
  • Safety

    From our premises on Chatham Docks and supported by by our in-house engineering, detailing and drawing service.

New American Embassy in London

July 2013 – Jan 2014
Client – OBO (US Government)
Main Contractor: Sir Robert McAlpine
Amcs Customer: Bauer Technologies Ltd

Project Requirements:

• 81 NR rotary bored large diameter pile cages 1500, approx. 60m long incorporating 4 base grouting circuits and 2 sonic reservation tubes.
• 457 NR rotary bored medium diameter (750mm) pile cages approx. 30m long.
• 176 NR CFA pile cages 600 diameter approx 12m long with integral plunge 63.5mm Gewi bar to 30m.

Video